Many projects require permits, leading to big delays in getting your project started. That’s why we have a full-time Permit Coordinator to help accelerate the permitting process. We’ll determine if we need an architectural design or engineer for your project, bringing in the necessary team to create permit drawings and complete the application process. This saves a lot of time and hassle, while we jump start your project and guide you through the planning and build process.Contact your insurance provider immediately and follow their claim process. Make sure to document all damage thoroughly with photos, videos, and create a detailed inventory of lost items with associated dates and costs. If it’s an emergency or you have safety concerns, contact us to make temporary repairs to prevent further damage, saving all receipts for reimbursement. We can assign you a dedicated project manager, guide you through the insurance adjuster process, then schedule a meeting with the adjuster to get a cost estimate.While we do operate on normal business hours, we will work closely with you to reduce the amount of time that you may need to take from work.
We can set up a lock box system for access when you are not available.
We will schedule multiple trades to meet on site at the same time to reduce the number of meetings needed.Depending upon the severity of the problem, repairs may take several hours to fix simple leaks to several weeks if more complex structural work is required. Major reconstruction and commercial building restoration may take even longer, extending to several months or years.
We'll help you identify the probelm, develop a proper plan, and figure out the best way to get your home or business repairs completed properly